Intel Desktop Meteor Lake-S CPUs To Feature Up To 22 Cores, Arrow Lake-S Up To 24 Cores, Quad Xe iGPU Cores & 125W TDPs
https://wccftech.com/intel-14th-gen-meteor-lake-s-22…ga-1851-platform/14th Gen Meteor Lake-S Desktop CPUs will take a step back and reduce the number of P-Cores while retaining the number of E-Cores. The lineup listed in the charts includes five different SKU configurations with the top variants featuring up to 22 cores in a combination of 6 P-Cores and 16 E-Cores. The P-Cores on the Meteor Lake CPUs are based on the brand-new Redwood Cove architecture while the E-Cores will utilize the Crestmont design
Meteor Lake-S 22 (6P + 16E) / 4 Xe Cores / 125W TDP
Meteor Lake-S 22 (6P + 16E) / 4 Xe Cores / 65W TDP
Meteor Lake-S 22 (6P + 16E) / 4 Xe Cores / 35W TDP
Meteor Lake-S 14 (6P + 8E) / 4 Xe Cores / 65WTDP
Meteor Lake-S 14 (6P + 8E) / 4 Xe Cores / 35WTDP
all SKUs will feature at least 4 Xe Cores for the iGPU and that's going to offer 64 Execution Units or 512 ALUs
Only the top die configuration will have a 125W "Unlocked" SKU range while the rest will come in the standard "Non-K" and "T" series with 65W and 35W TDPs.
Arrow Lake-S 24 (8P + 16E) / 4 Xe Cores / 125W TDP
Arrow Lake-S 24 (8P + 16E) / 4 Xe Cores / 65W TDP
Arrow Lake-S 24 (8P + 16E) / 4 Xe Cores / 35W TDP
GPU in 14th Gen Meteor Lake chips are based on a
TSMC 5nm GPU the 15th Gen Arrow Lake CPUs will utilize a
TSMC 3nm GPU.
Добавление от 31.10.2022 11:06:
The 14th Gen Meteor Lake
production stepping (Intel 4) is scheduled to be delivered this quarter with a volume ramp in 2023 while
Intel 3 is also expected to
enter the early production phase by the end of 2023. Do note that these are early charts and we are still years away from the launch of Meteor Lake and Arrow Lake CPUs
Исправлено: Omega, 31.10.2022 11:37